Turner accessibility
Premises accessibility (Inspected 25 March 2020)
Location | Criteria | Notes | Accessible |
---|---|---|---|
05 - Parking | |||
05 - Parking | Is the parking area free of obstructions/hazards? | Yes | |
05 - Parking | Number of designated parking spaces | 1 | Yes |
05 - Parking | Parking type available | Off-Street | Yes |
07 - Designated Parking | |||
07 - Designated Parking | Designated parking distance from building entrance | 90 m | Yes |
07 - Designated Parking | Designated parking space length | 5000 mm | Yes |
07 - Designated Parking | Designated parking space width | 3000 mm | Yes |
07 - Designated Parking | Is the designated parking level? | Yes | |
07 - Designated Parking | Is there unobstructed access to the footpath? | Yes | |
08 - Kerb Ramp | |||
08 - Kerb Ramp | Is a kerb ramp available? | Yes | |
09 - Path of Travel | |||
09 - Path of Travel | Is the path lit adequately? | Yes | |
09 - Path of Travel | Is the path 1m wide on straight, 1.5m wide on curves? | Yes | |
09 - Path of Travel | Is the path firm and slip resistant? | Yes | |
09 - Path of Travel | Is the path free of lips greater than 3mm? | No | |
09 - Path of Travel | Is the path free of obstructions? | Yes | |
09 - Path of Travel | Is the path free of pot-holes, ridges, overgrowth and debris? | Yes | |
09 - Path of Travel | Is the path level? | Yes | |
09 - Path of Travel | Is the path obvious and likely to be used? | Yes | |
11 - Path of Travel Ramp | |||
11 - Path of Travel Ramp | Are there ramp landings at the top and bottom at least 1500mm long? | No | |
11 - Path of Travel Ramp | Does the ramp have a suitable edge/kerb rail? | Yes | |
11 - Path of Travel Ramp | Does the ramp have suitable handrails on both sides? | Yes | |
11 - Path of Travel Ramp | Does the ramp have tactile indicators at the top and bottom? | No | |
11 - Path of Travel Ramp | Ramp height | 500 mm | Yes |
11 - Path of Travel Ramp | Ramp length | 7000 mm | Yes |
12 - Building Entrance | |||
12 - Building Entrance | Does the entrance area have adequate lighting? | Yes | |
12 - Building Entrance | Is external undercover queuing available for the entrance? | No | |
12 - Building entrance - Doormats | |||
12 - Building Entrance - Doormats | Is there a recessed doormat level with the surrounding surface? | No | |
12 - Building Entrance - Doorway | |||
12 - Building Entrance - Doorway | Doorway opening width | 1900 mm | Yes |
12 - Building Entrance - Doorway | Is the doorway/entrance covered and protected from rain? | No | |
20 - Voting Area | |||
20 - Voting Area | Is the floor surface even? | Yes | |
20 - Voting Area | Is the floor surface slip-resistant? | Yes | |
20 - Voting Area | Is the voting/activity area well lit for purpose? | Yes | |
20 - Voting Area | Will there be at least 1.5 m free circulation space around obstacles? | Yes | |
26 - Premises Amenities | |||
26 - Premises Amenities | Is there a clear path of travel to the toilets? | Yes | |
26 - Premises Amenities | Public toilet facilities available | Male, Female | Yes |